{"course":{"slug":"knowledge-fidic-type-construction-contracts","title":"Knowledge Of FIDIC Type Construction Contracts","categorySlug":"projects-contracts","category":"Projects & Contracts","duration":"5 Days","mode":"Public","price":"3,900","description":"It is accepted that as the number and size of construction projects increase, so does the number of claims and more often than not their size. This is a feature, which also relates to Counterclaims. While such claims and counterclaims cannot be totally avoided, they can be successfully dealt with if they are predicted and if proper and careful planning, preparation, and control are exercised. It is also true that many of these claims and counterclaims end in bitter disputes that are fought the whole way to arbitration.","accreditation":"Alkhobraa","featured":false,"trending":false,"tagColor":"","imported":true,"courseCode":"PM-271","sessions":[{"startDate":"2026-10-04","endDate":"2026-10-08","durationDays":5,"deliveryType":"Public","city":"Kuala Lumpur","country":"Malaysia","price":"4,500"},{"startDate":"2026-11-29","endDate":"2026-12-03","durationDays":5,"deliveryType":"Public","city":"Riyadh","country":"KSA","price":"3,900"},{"startDate":"2026-12-21","endDate":"2026-12-25","durationDays":5,"deliveryType":"Public","city":"Cameroon","country":"Central Africa","price":"4,500"}],"detail":{"whoShouldAttend":{"description":"The following audience will obtain maximum benefit from attending this event: Contractors, Sub-Contractors, Architects, Quantity Surveyors, Civil Engineers, Financiers, Lawyers, Legal Advisors, Project Managers, Design Consultants, Loss Adjusters, Registered Arbitrators and Insurance Consultants.","roles":["Professionals in Claims & Disputes","Project managers and engineers","Contracts and commercial professionals"],"stat":{"number":"","label":""}},"agenda":[{"day":"Day 1","title":"Essential Principles of a Contract","description":"","topics":["Definitions","Pre-requisites of a contract","Legal concepts","Rights & Obligations​"]},{"day":"Day 2","title":"Criteria for Selection of the Appropriate Contract Conditions","description":"","topics":["The Functions to be Performed","The Risks to be Allocated","The Method of Remuneration","Management Roles"]},{"day":"Day 3","title":"Workshop No.1","description":"","topics":["Analysis of Workshop No.1","The Design Function and its variations under the various Forms","The design function under FIDIC‘s Old and New Red Books","The design function under FIDIC‘s Old and New Yellow Books"]},{"day":"Day 4","title":"17-The progression from Claim to Dispute & Dispute Resolution Mechanisms","description":"","topics":["Dispute Resolution Mechanisms under FIDIC‘s Old Red Book","Dispute Resolution Mechanisms under FIDIC‘s Old Yellow Book","Dispute Resolution Mechanisms under FIDIC‘s New Suite of Contracts","The Differences between the Old and the New Forms"]},{"day":"Day 5","title":"22-ADR –v- Arbitration","description":"","topics":["Advantages and Disadvantages","Where to use each and where not to do so","Time, cost, and finality","Features"]}],"outcomes":["How to draft claims and counterclaims and how to assess them successfully.","The most commonly occurring disputes and how they can be avoided","The relationship between risks, events, notices, and claims.","The recent developments in claim avoidance","The program includes practical examples on claims and their formulation in the form of workshops at the end of each of the five days of the program."],"faqs":[{"q":"How long is the course?","a":"5 days."},{"q":"Where is the course held?","a":"In person across Cameroon ,Central Africa, Kuala Lumpur, Malaysia, Riyadh, KSA and other locations."},{"q":"How much does it cost?","a":"Fees range from USD 3,900–4,500 depending on location and date."},{"q":"Who should attend?","a":"The following audience will obtain maximum benefit from attending this event: Contractors, Sub-Contractors, Architects, Quantity Surveyors, Civil Engineers, Financiers, Lawyers, Legal Advisors, Project Managers, Design Consultants, Loss Adjusters, Registered Arbitrators and Insurance Consultants."}]}},"slim":{"slug":"knowledge-fidic-type-construction-contracts","title":"Knowledge Of FIDIC Type Construction Contracts","categorySlug":"projects-contracts","category":"Projects & Contracts","duration":"5 Days","mode":"Public","price":"3,900","description":"It is accepted that as the number and size of construction projects increase, so does the number of claims and more often than not their size. This is a feature, which also relates to Counterclaims.…","titleAr":"الإلمام بعقود التشييد من نوع FIDIC","descriptionAr":"من المسلّم به أنه كلما ازداد عدد مشاريع التشييد وحجمها، ازداد عدد المطالبات وحجمها غالبًا. وينطبق ذلك أيضًا على المطالبات المضادة. ورغم تعذّر تجنّب هذه المطالبات كليًا، يمكن التعامل معها بنجاح عند…","accreditation":"Alkhobraa","featured":false,"trending":false,"draft":false,"thin":false,"tagColor":"","sessions":[{"startDate":"2026-10-04","endDate":"2026-10-08","durationDays":5,"deliveryType":"Public","city":"Kuala Lumpur","country":"Malaysia","price":"4,500"},{"startDate":"2026-11-29","endDate":"2026-12-03","durationDays":5,"deliveryType":"Public","city":"Riyadh","country":"KSA","price":"3,900"},{"startDate":"2026-12-21","endDate":"2026-12-25","durationDays":5,"deliveryType":"Public","city":"Cameroon","country":"Central Africa","price":"4,500"}]}}