{"course":{"slug":"api-580-581-asme-pcc-3","title":"API 580/581/ASME PCC-3: Risk-based Inspection Program, Technology and Planning Methods","categorySlug":"mechanical-maintenance","category":"Mechanical, Maintenance & Reliability","duration":"5 Days","mode":"Public","price":"4,500","description":"Risk-based-inspection (RBI) has become the state-of-the-art approach toward inspection and maintenance planning and asset integrity management in oil and gas, refining and petrochemical industries in the last couple of decades. RBI represents the approach that links the operational side – consequences of the failures with the asset integrity management efforts, first of all, inspection planning.","accreditation":"API","featured":false,"trending":false,"tagColor":"","imported":true,"courseCode":"ME-529","sessions":[{"startDate":"2026-08-09","endDate":"2026-08-13","durationDays":5,"deliveryType":"Public","city":"Riyadh","country":"KSA","price":"4,500"},{"startDate":"2026-12-13","endDate":"2026-12-17","durationDays":5,"deliveryType":"Public","city":"Dubai","country":"UAE","price":"4,500"}],"detail":{"whoShouldAttend":{"description":"This API 580/581/ASME PCC-3 training course is suitable to a wide range of professionals working in the maintenance, operation and design of the petrochemical and other process industries:\n\n Asset managers\n Inspectors and NDT specialists\n Maintenance Engineers\n Plant Engineers\n Corrosion and material specialists","roles":["Asset managers","Inspectors and NDT specialists","Maintenance Engineers","Plant Engineers","Corrosion and material specialists"],"stat":{"number":"","label":""}},"agenda":[{"day":"Day 1","title":"Introduction to RBI process, API RP 580","description":"","topics":["Introduction and Asset Integrity and RBI","Purpose/general aspects of RBI; RBI benefits & limitations","Scope, definitions, terms and abbreviations","Risk Assessment concepts"]},{"day":"Day 2","title":"Introduction to RBI process, API RP 580, continued","description":"","topics":["Accessing probability of failure","Accessing consequences of failure","Risk determination, assessment and management","Risk management with inspection activities"]},{"day":"Day 3","title":"Introduction to API 581 (RBI) Part 1 - Inspection Planning Methodology & Probabilities of failure","description":"","topics":["API RP 581 Scope and definitions,","Probability of Failure & Consequence of Failure","Risk analysis and inspection planning","Probability of failure methodology"]},{"day":"Day 4","title":"Consequence of Failure Methodology","description":"","topics":["Consequence of failure types","Consequence of failure methodology","Consequence of failure calculation levels","Consequence Level 1 calculation process and results summation"]},{"day":"Day 5","title":"Special Equipment Calculations","description":"","topics":["RBI on Pressure relief devices","Workshop – pressure relief device RBI","RBI on Atmospheric storage tanks","RBI on Heat exchanger tube bundles"]}],"outcomes":["Grasp the RBI process, as applied on static pressurized equipment, piping & storage tanks","Enhance process safety and potentially reduce or eliminate unit / system downtimes","Verify and implement most appropriate methods for damage identification & monitoring","Optimize inspection plan compared with traditional inspection practices","Increase equipment reliability by proper damage management, hence increasing plant operation efficiency and achieving most favorable lifecycle cost of the assets","Implement state-of-the-art approach toward the asset management"],"faqs":[{"q":"How long is the course?","a":"5 days."},{"q":"Where is the course held?","a":"In person across Dubai, UAE, Riyadh, KSA and other locations."},{"q":"How much does it cost?","a":"USD 4,500 per participant."},{"q":"Who should attend?","a":"This API 580/581/ASME PCC-3 training course is suitable to a wide range of professionals working in the maintenance, operation and design of the petrochemical and other process industries:"}]}},"slim":{"slug":"api-580-581-asme-pcc-3","title":"API 580/581/ASME PCC-3: Risk-based Inspection Program, Technology and Planning Methods","categorySlug":"mechanical-maintenance","category":"Mechanical, Maintenance & Reliability","duration":"5 Days","mode":"Public","price":"4,500","description":"Risk-based-inspection (RBI) has become the state-of-the-art approach toward inspection and maintenance planning and asset integrity management in oil and gas, refining and petrochemical industries in…","titleAr":"التفتيش المبني على المخاطر: البرنامج والتقنيات وطرق التخطيط وفق API 580/581 و PCC-3 من ASME","descriptionAr":"أصبح التفتيش القائم على المخاطر (RBI) النهج الأحدث في تخطيط التفتيش و الصيانة و إدارة سلامة الأصول. وذلك في صناعات النفط والغاز والتكرير والبتروكيماويات خلال العقدين الماضيين. ويمثّل هذا النهج ربطًا…","accreditation":"API","featured":false,"trending":false,"draft":false,"thin":false,"tagColor":"","sessions":[{"startDate":"2026-08-09","endDate":"2026-08-13","durationDays":5,"deliveryType":"Public","city":"Riyadh","country":"KSA","price":"4,500"},{"startDate":"2026-12-13","endDate":"2026-12-17","durationDays":5,"deliveryType":"Public","city":"Dubai","country":"UAE","price":"4,500"}]}}